I have previously mentioned that I had a bathroom floor with some dry rot.
Well, not any more. I got up at 3:30 this morning and finished it up. Today was the day of our re-inspection (we are selling our house) and it all had to be done.
On Monday, the contractor who was doing some other work for us, told me what I had to do to fix it all up. His information was a great help and he pointed me towards Fix It All. With out his help, I wouldn't have known what to do. Monday night, I used the Fix It All and then Tuesday night was the finish it all stretch.
But, because I had so much floor to replace, I had to use some floor levelling stuff. But it needed 10 hours to cure. So, while it was curing, I was sleeping. Then the work began at 3;30. I had to replace the stylish black and white tile and then a toilet. I don't like replacing toilets. I have had bad luck with them in the past and they leak and have a lot of water. They suck.
But this time, the construction project gods were with me and it went in with out a hitch. No leaks and a shiny new floor.
We passed our inspection and are one step closer to selling our house!